11 men can complete a work in 18 days. If 1 man does the work of 2 women, find the time taken by 6 women to complete the same work.
From a SSC CHSL Tier-1 Quantitative Aptitude practice set · Quantitative Aptitude
Tap an option to check your answer.
Show answer and explanation
Correct answer: (D) 66.0 days
Total work in man-days = 11x18 = 198. In woman-days = 198x2 = 396. Time for 6 women = 396/6 = 66.0 days.
हिंदी में प्रश्न
11 पुरुष एक कार्य को 18 दिनों में पूरा कर सकते हैं। यदि 1 पुरुष, 2 महिलाओं के बराबर कार्य करता है, तो 6 महिलाओं को वही कार्य पूरा करने में कितना समय लगेगा?
उत्तर जाँचने के लिए किसी विकल्प पर टैप करें।
उत्तर और व्याख्या देखें
सही उत्तर: (D) 66.0 days
Total work in man-days = 11x18 = 198. In woman-days = 198x2 = 396. Time for 6 women = 396/6 = 66.0 days.
More solved Quantitative Aptitude questions
- A square-shaped plot has a side of 30 m. Fencing it costs Rs. 20 per metre, and paving its floor costs Rs. 15 per sq. m. Find the total…
- The calendar of the year 2072 can be used again for which year?
- The compound interest on a sum for 2 years at 15% per annum (compounded annually) is Rs. 3800. Find the principal.
- A chord of length 48 cm is drawn in a circle of radius 40 cm. Find the perpendicular distance of the chord from the centre of the circle.
- Two numbers are in the ratio 5:8 and their difference is 54. Find the larger number.
- In the series 7, 49, ?, 10192, each number is obtained by multiplying the previous number by the sum of its digits. What number will…